Pre-Application Conference Waiver (PAC)

Body

Web page revised 1.1.26

When is a Pre-Application Conference required and when can the conference be waived?

A pre-application conference or approval of a pre-application waiver is required before an applicant submits for a Type II or a Type III review.

The Responsible Official may waive the requirement for a pre-application conference only if an application is relatively simple.

Granting the pre-application conference waiver may increase the risk that the application will be rejected or processing will be delayed.

What is the purpose of the Pre-Application Conference?

The pre-application conference is an opportunity for the applicant to present their proposal and ask questions of staff and other affected agency representatives, such as Washington Department of Transportation. During this one-hour session, the applicant will be informed about the applicable review standards and possible development issues.

Applicants are encouraged to provide complete and accurate information with their submittal package in order for staff to provide a thorough review.

What is the pre-application waiver application procedure?

A waiver requires the applicant to submit all items on the submittal checklist.

  • Staff will follow the following approval guidelines in arriving at a decision:
  • Pre-app waiver should not generally be approved for Planned Unit Developments, Conditional Uses, Road Modifications and Variances
  • Pre-app waivers may be considered where development is proposed outside of critical areas or critical area buffers
  • Pre-app waivers may be considered for projects that are simple and straight forward, with no apparent issues that cannot be resolved during the normal review process
  • Pre-app waivers may be considered where the applicant has successfully demonstrated experience with similar projects in the county.

Note: An approved pre-application conference waiver does not relieve the applicant from complying with all local, state, and federal regulations.

What is the application and review process?

See Type I process Clark County Code 40.510.010.  

All land use reviews are completed online.

Follow the Land Use Application Submittal Process and these instructions on how to apply online.

Contact planningapps@clark.wa.gov with questions on how to apply.

What are the risks if I don’t go through the pre-application process?

Staff considers the pre-application conference an important part of the development process that will ultimately save the applicant time. By applying for a pre-app waiver, the applicant is assuming the risk that unforeseen issues will arise and result in permit processing delays.

Can the decision be appealed?

The Responsible Official's decision may be appealed to the Hearing Examiner by the applicant or any person or group. An appellant must submit an appeal application and fee within 14 calendar days after the written notice of the decision is sent. See Appeals. 

Submittal Checklist

The following checklist identifies information to be included with the application.

All items must be submitted before the application will be considered Counter Complete. All items with a checkbox must be submitted before the application will be determined Fully Complete.

  1. Application form - The application form shall be completed and original signed in ink by the applicant.
  2. Application fee - The required fee shall accompany the application.
  3. GIS Developer’s packet - A copy of the GIS Developer’s Packet shall be submitted with the application. Applicants can order a GIS Developer's Packet with a credit card online. For more information, contact GIS at 564.397.4082 or themapstore@clark.wa.gov.
  4. Narrative
    • Project Description
    • Why this project should qualify for a waiver
    • The narrative shall list 3-5 similar (type and scale) successful projects completed within Clark County over the last two years
  5. Proposed plan
    • Layout and dimensions of site and proposed improvements or layout
    • North arrow oriented to the top, left or right of page, scale and date
    • Location of all existing buildings/structures, septic tanks and drain fields, wells on site and their distance in feet from all property lines
    • Public or private roads and their dimensions & locations
    • Environmental Constraints on site
Fee schedule

The following fees are required to be paid when the application is submitted.  

Planning: $368    
Engineering: $38

Reference

Clark County Code 40.510.020(A)(2)(b) and 40.510.030(A)(2)(b)