Northeast 179th Street, from Northeast 29th Avenue to Northeast 50th Avenue

Public Works will reconstruct approximately 0.8 miles of Northeast 179th Street, between Northeast 29th Avenue and Northeast 50th Avenue to meet current road standards. This will involve modifying the road’s vertical alignment (reducing hills and dips), widening the roadway, and adding a curb, gutters and a separated joint-use bike/pedestrian pathway on both sides. The road will initially include one travel lane in each direction and a center left-turn lane, and right turn lanes in some locations.

Page contents (click to jump to a section)
  • About the project
  • Project timeline
  • Budget
About the Project
tag

The project will reconstruct approximately 0.8 miles of Northeast 179th Street in north-central Clark County, between Northeast 29th and 50th avenues.

tag

This project improves the local transportation system to support the Clark County Comprehensive Growth Management Plan along the Northeast 179th Street corridor. Road improvement projects in this area are needed to accommodate increasing traffic volumes and preserve mobility and safety as the area develops. When complete, it will improve travel times, encourage economic development, optimize intersection locations, upgrade stormwater management and bring the corridor’s roads up to current standards. 

tag

The project will reconstruct the existing roadway between Northeast 29th and 50th avenues. This will involve modifying the road’s vertical alignment (reducing hills and dips), widening the roadway, and adding a curb, gutters and a separated joint use bike/pedestrian pathway on both sides. New stormwater facilities will also be installed to meet the needs of this project. 

Project goals:

Provide infrastructure improvements in support of the Clark County Comprehensive Growth Management Plan and changing needs of the community.

Use sound engineering designs to improve corridor safety and reduce congestion.

Minimize adverse environmental impacts and mitigate for unavoidable impacts.

Develop the project with input from local residents, businesses, community organizations, and property owners, and keep residents informed of relevant project activities.

Minimize impacts to adjacent property owners while meeting safety and road standards and permitting requirements.

Develop a roadway and drainage system that Clark County can adequately maintain. 

tag

Public Works incorporates resident input when feasible. County projects are designed by professional engineers. We balance community input with other considerations to create the best possible final design. Considerations include legal requirements, environmental impacts, budget and safety. Input among residents, user groups and stakeholders often differs. While we do our best to incorporate resident input, we are not able to incorporate all input or requests. Please contact the project manager (information at the bottom of the page) with questions or comments.

Project timeline

Design: Spring 2026 – Spring 2031

Construction: Summer 2031

Budget

The total budget identified for the project is $28,000,000[KM1] [MM2] .

Comments or Questions

Please contact the project manager.