SMALL WORKS PROJECTS

Body


As of 2013, Clark County is using the Municipal Research and Services Center of Washington (MRSC) Rosters to maintain its small works roster for non-federally funded public work projects under $350,000. To meet the eligibility requirements for Clark County small work projects contractors must submit their application (at no cost) to www.mrscrosters.org and select Clark County in your application. 

You must be registered on the MRSC Roster to receive the Small Works Quote documents.

 


LIMITED SMALL WORKS SHOWER TILE REPLACEMENT at CENTER for COMMUNITY HEALTH
Quote Number: 0341
General Information:

The work includes installing new shower tiles, pan and drain for water proofing two (2) showers.

Release Date: Wednesday, August 31, 2022
Closing Date: Wednesday, September 21, 2022
Pre-Bid Conference:

A Non-Mandatory meeting has been scheduled.

Attachments:
Engineer's Estimate: N/A
Awarded to: Division 9 Flooring of Bothell WA - total amount including Alternate Work $18,638.73
CORRECTIONAL FACILITY WINDOW REPLACEMENTS
Quote Number: 0339
General Information:

This project encompasses the removal and replacement of approximately 224 pieces of glass in the windows of the Clark County Correctional Facility.

Addendum #1 - Issued Tuesday, August 30, 2022
Addendum #2 - Issued Monday, September 12, 2022  - QUOTE CANCELLED

 

Release Date: Wednesday, August 17, 2022
Closing Date: Wednesday, September 14, 2022
Pre-Bid Conference:

A site meeting has been scheduled for this project.

Attachments:
None
Engineer's Estimate: N/A
Awarded to: WHEN AVAILABLE
LIMITED SMALL WORKS QUOTE #0337 SCHOOL ZONE FLASHER ELECTRIC SERVICE REPAIRS
Quote Number: 0337
General Information:

The work includes construction of the school zone flasher electric service repairs at three (3) different sites.

Release Date: Wednesday, August 3, 2022
Closing Date: Wednesday, August 10, 2022
Pre-Bid Conference: N/A
Attachments:
Engineer's Estimate: N/A
Awarded to: Lindberg Electrical LLC of Yacolt WA - total amount $45,528.00
RE-QUOTE NE 10TH AVE MITIGATION and LANDSCAPE INSTALLATION and MAINTENANCE
Quote Number: 0338
General Information:

The work includes plant installation and with a two (2) year plant establishment after the initial planting, as well as traffic and erosion control.

Release Date: Wednesday, August 3, 2022
Closing Date: Wednesday, August 24, 2022
Pre-Bid Conference: N/A
Attachments:
Engineer's Estimate: N/A
Awarded to: Bella Terra LLC of Woodland WA - total amount $287,751.38
CENTER for COMMUNITY HEALTH AHU ENERGY IMPROVEMENTS PROJECT
Quote Number: 0336
General Information:

The scope of work is to replace economizer, power exhaust and mixing dampers, replacement of existing actuators w/Belimo actuators & sensors and replacing the DX controllers w/Lynxspring JENEsys 834’s & IOM’s.

Release Date: Wednesday, July 20, 2022
Closing Date: Wednesday, August 3, 2022
Pre-Bid Conference: N/A
Attachments:
Engineer's Estimate: N/A
Awarded to: Apollo Mechanical Contractors of Tigard, OR - total amount $318,314.05
NE 10th AVE MITIGATION and LANDSCAPE INSTALLATION and MAINTENANCE
Quote Number: 0335
General Information:

The work includes plant installation and with a two (2) year plant establishment after the initial planting, as well as traffic and erosion control.

Release Date: Wednesday, July 6, 2022
Closing Date: Wednesday, July 20, 2022
Pre-Bid Conference: N/A
Attachments:
None
Engineer's Estimate: N/A
Awarded to: NO RESPONSE
MIRACLE METHOD SURFACE REFINISH JUVENILE DETENTION CENTER SHOWERS
Quote Number: 0334
General Information:

This limited small works project consists of the refinish of twelve (12) showers inside the Juvenile Detention Center using the Miracle Method process.

 

Release Date: Wednesday, June 29, 2022
Closing Date: Wednesday, July 13, 2022
Pre-Bid Conference:

A non-mandatory meeting has been scheduled.

Attachments:
Engineer's Estimate: N/A
Awarded to: Miracle Method of Greater Portland of Portland OR - total amount $28,947.80
MIRACLE METHOD SURFACE REFINISH CORRECTIONS CENTER SHOWERS
Quote Number: 0333
General Information:

The project consists of the refinish of twenty-eight (28) shower in the Clark County Corrections Center using the Miracle Method process.

Release Date: Wednesday, June 22, 2022
Closing Date: Wednesday, July 27, 2022
Pre-Bid Conference:

A meeting is scheduled.  Must pass background check to participate.

Attachments:
Engineer's Estimate: N/A
Awarded to: Miracle Method of Greater Portland of Portland OR - total amount $314,348.91
ROUND LAKE and BIG EDDY GREENWAY HAZARD TREE REMOVAL
Quote Number: 0331
General Information:

There are twenty-one (21) trees to be mitigated by removal and deadwood pruning at two (2) sites located in eastern Clark County.

Addendum 1 - Issued Thursday, June 2, 2022

Release Date: Wednesday, May 25, 2022
Closing Date: Wednesday, June 15, 2022
Pre-Bid Conference:

A site meeting is scheduled for Thursday, June 2, 2022.

Attachments:
Engineer's Estimate: N/A
Awarded to: Confluence Tree Care, LLC of Washougal WA - total amount $33,703.20
149th STREET WAREHOUSE & BUILDING "B" RECOVER ROOFING PROJECT
Quote Number: 0332
General Information:

The project is to recover and overlay the existing roofing system, which is one (1) layer, with new single-ply membrane roofing system with new flashing and other related work. 

The project area is approximately 15,405 SF.

Release Date: Wednesday, May 18, 2022
Closing Date: Wednesday, June 15, 2022
Pre-Bid Conference:

A Meeting is scheduled for May 25, 2022.

Attachments:
Engineer's Estimate: N/A
Awarded to: Roof Toppers, Inc. of Vancouver WA - total amount $232,276.59 including Additive Alternate #1