The project consists of the removal of the existing 34’L x 33”H wooden retaining wall. Removal and replacement of 42’ of concrete sidewalk, pruning the roots of the adjoining sequoia tree back to allow space for the new retaining wall, and construction of the new concrete retaining wall.
Addendum 1 - Issued Monday, April 6, 2026