Commercial forms and checklists

Body

ePlan Review

Effective September 19, we will no longer accept paper submittals. Visit ePlan Review for information and electronic file requirements.


Review the handouts and forms below to familiarize yourself with required permits and project requirements and submittals prior to applying online. Find out more about application submittals.

Apply online, learn more about CC LMS

Application submittal guidance

All forms are PDF files unless noted otherwise.

Commercial Construction Revised date
Agricultural Buildings 01/29/21
Alternate Materials, Design, and Methods of Construction 01/29/21
Commercial Building Permit Application 04/25/19
Code Summary Requirements and Worksheet for New Construction 01/29/21
Commercial Permit Categories
- Business Name Change Only Affidavit
09/01/22
03/29/13
Commercial Submittal Checklist
- Deferred Submittals
09/01/22
03/01/22
Damage and As-built Site Investigation Report 02/01/10
Demolition 09/20/21

Energy Code requirements
Visit the Washington State Energy Code Technical Support site for information and documents


 

Fabricator Approval 10/01/08

Geotech
Geotechnical Engineer Responsibility and Requirements in a Geotech
Report

Soil Investigations and Geotechnical Reports - general code requirements

 

04/27/20

01/29/21

Mechanical -
HVAC System Guidelines
HVAC Replacement - Checklist for RTU and Split Systems
Mechanical Permit

 

10/04/17
08/13/19
01/30/23

Plumbing Permit 10/03/16
Re-roofing 
- Re-roofing Questionnaire
07/16/18
12/05/22
Re-siding  07/16/18
Signs 10/03/16
Special Inspections and Testing 08/17/17
Structural design criteria - commercial 01/29/21
Swimming Pool Requirements
- Swimming Pool and Spa Barrier Requirements
09/01/22
12/15/17
Tenant improvements
- Information
- Checklist
See also Commercial Permit Categories
06/01/11
09/01/22
Window Replacement  07/16/18
Heating, Cooling and Plumbing Revised date
HVAC System Guidelines 10/04/17
Mechanical Permit- heating and cooling 01/30/23
Plumbing Permit  10/03/16
Trade Permits Revised date
Mechanical (LTD) 09/20/16
Roofing, Siding, and Window Replacement (RSW) 07/16/18
Manufactured Structures Revised date
Manufactured Home Storage 02/16/12
Mobile Home Submittal Packet 09/01/22
Road Approach 02/16/12

Clark County Code Title 6 - Adopted fees

Floodplain review and elevation certificate